Post Edit Home Help

Key Pages

JIAAW Classroom Homepage |
---- |
The Archaeology of College Hill 2006-07 |
---- |
Home |
---- |
Syllabus |
---- |
Readings: private forum

Changes [Nov 17, 2009]

Ben Colburn's Field...
Excavation & Unit S...
Michael Camarillo -...
Week 9- 11.9.09
Images
Elise M's Field Blog
Response Seven
   More Changes...
Changes [Nov 17, 2009]: Ben Colburn's Field..., Excavation & Unit S..., Michael Camarillo -..., Week 9- 11.9.09, ... MORE

Find Pages

The third week of excavation moved towards the completion of the shovel test pits and the opening of all four excavation units in the northern portion of the John Brown House lawn. So far, two teams have started excavation on two units, and both shovel test pits are now closed.

Uploaded Image
Removal of topsoil at Excavation unit 2

Uploaded Image
North-facing wall of STP N0W35

Uploaded Image
STP N0W35 reveals a hole protruding into the side wall the length of Elise's forearm

Uploaded Image
Final photo of STP N0W35

Uploaded Image
STP N0W30: amidst clay and a shell deposit, a square rock at the base of the context

Uploaded Image
Partially cleared surface of Unit 2

Uploaded Image
Circular feature in one of the excavation units

New Page - Edit this Page - Attach File - Add Image - References - Print
Page last modified by Brad Thu Sep 25/2008 14:50
You must signin to post comments.
Site Home > The Joukowsky Institute for Archaeology Classroom > The Archaeology of College Hill > Week 3 Fieldwork