Post Edit Home Help

Key Pages

JIAAW Classroom Homepage |
---- |
The Archaeology of College Hill 2006-07 |
---- |
Home |
---- |
Syllabus |
---- |
Readings: private forum

Changes [Nov 17, 2009]

Ben Colburn's Field...
Excavation & Unit S...
Michael Camarillo -...
Week 9- 11.9.09
Images
Elise M's Field Blog
Response Seven
   More Changes...
Changes [Nov 17, 2009]: Ben Colburn's Field..., Excavation & Unit S..., Michael Camarillo -..., Week 9- 11.9.09, ... MORE

Find Pages

Week 7 (October 27) saw the continuation of work by the class as a whole. Notably, the lighting is getting worse, even before daylight saving strikes. 5 units are now open and in full swing, with only 3 excavation days left.

Uploaded Image
Recently added for Community Archaeology and initially excavated by two grad students, Unit 5 is handed over to Evie and Elise.

Uploaded Image
View to the northeast, looking at Units 1 and 2.

Uploaded Image
Unit 2 prepares the planning frame for a quick drawing.

Uploaded Image
Unit 4 finds an impressed chunk of mortar.

Uploaded Image
Whitney and Steffi brush clean the exposed rocks of a rubble layer in the eastern half of the unit.

Uploaded Image
Unit 5 having excavated two contexts that surround the central feature.

Uploaded Image
Krysta holds out a ceramic fragment for discussion.

Uploaded Image
Unit 1 employs a saw to cut through a major root.

New Page - Edit this Page - Attach File - Add Image - References - Print
Page last modified by Brad Mon Dec 08/2008 08:52
You must signin to post comments.
Site Home > The Joukowsky Institute for Archaeology Classroom > The Archaeology of College Hill > Week 7 Fieldwork